Materials:
- steel pipe of larger diameter than the pillars;
- Sheet steel;
- reinforcement 10 mm or thicker.
The manufacturing process of the device and the technology of its use
The tool is a meter-long piece of pipe with a slightly larger diameter than the thickness of the posts being driven in. On one side, the pipe must be plugged by welding a sheet steel insert. Then 2 handles from fittings are welded to the pipe. Since they are thin, for the comfort of your hands they should be wrapped with fabric ribbons.
The tool is put on the head of the column, then it is placed at the installation site.
Next, the device is lifted up by the handles and sharply lowered down.
As a result of the impact of the plug on the head of the column, the latter goes deeper into the ground.
After making a couple of dozen blows, you can drive the post to the desired depth.
Be sure to pause while working to control the vertical.